Coal Stick Machine Installation And Commissioning

The raw materials can be: coal powder, lignite, charcoal powder, iron powder, aluminum powder, lead carbon, talcum powder, rubber carbon black and other different raw materials can be formed into rods, and the finished rods or finished balls can be used for barbecue and heating. , Hookah, agriculture, industry can be used are feasible, widely used

1. Large feeding screw lead, fast feeding, small advancing screw lead, saving power.

2. The shaft seat and the cylinder are rigidly connected, with high concentricity, anti-reverse thrust, and the machine is stable.

3. The part to be sealed adopts a fault structure, and the dirt is leaked from the fault.

4. V-belt transmission, stable operation, low noise, and its overload protection function.

5. The head of the coal stick machine is connected with the cylinder body with a snap ring structure and a bolt structure, which can be customized according to the needs of users

Installation and commissioning

1. Before installation, all parts must be thoroughly cleaned to remove rust that has appeared during transportation or storage for a long time, and check whether the parts are damaged.

2. Pour the foundation with concrete according to the foundation drawing, and leave the screw holes. After the concrete is solidified, the coal rod machine is hoisted on the concrete foundation, the screw holes are aligned, and the concrete is grouted twice. After the anchor screws are solidified, use a level to correct The machine can be tested after the machine is stable.

3. Lubricate the lubrication parts with moderate amount of oil before testing the machine. Check whether all bolts are loose, and tighten them. Jog the machine and observe whether there are foreign objects or abnormal sounds. All confirmations are correct before starting operation. And check whether the power direction is correct.

4. After the machine runs dry for 3~5 minutes, everything is normal and it can be put into trial production. The new machine should be fed evenly and dry and wet (generally 12%~15% moisture content)