1. The terrain can be selected according to the source of raw materials before installation.
2. The crusher is fixed on the concrete with anchor bolts. The ore chute should be set aside in the basic design, and its inclination should not be less than 50 degrees, but the user can also set it according to the feeder and transportation equipment.
3. The motor should be installed in the opposite direction of the feed inlet.
4. The location of electrical equipment should be easy to use.
5. Before debugging the crusher, first check whether the fasteners of the institute are completely firm.
6. Whether metal objects or other non-breakable debris fall into the inspection body
7. Check whether the bearing has suitable lubricating oil.
8. Rotate the rotor by hand to see if it is normal and there is no friction. If it is confirmed to be unimpeded, it can be started without any problems. After half an hour of trial operation, there was no noise and no shaking. When the temperature rise of the bearing does not exceed 30, load test operation can be carried out.